How to connect iC7max/iC5700 BlueBox and Target via Active Probe?

24-Sep-2024

The Active Probe is connected to the target on one side and the other side it connects to the iC7max/iC5700 FNet port via the FNet cable.

In the Setup and Configure Hardware Tutorial you'll find detailed steps to connect to the following Active Probes:

  • Infineon DAP/DAPE II
  • AGBT/SGBT/Aurora Active Probe (Infineon AGBT, Infineon SGBT (HSTCU), Arm HSSTP II, RH850 Aurora, MPC5x/SPC5X Aurora)
  • Active Probe Debug
  • Active Probe Parallel


More resources

Was this answer helpful?